The Single Best Strategy To Use For iec test equipment
Suppose a manufacturer has an item and puts it under dust testing. In case the products is robust and durable, it won’t fail the dust testing.
And if There's no uncovered metal function then the one test that can be performed is a visible inspection? So, by way of example I'd